
Aggregate loaded at our Paisley Stone Quarry.

Shallenberger Construction prepares a site for a compressor station.

A water impoundment for frac water at an area Marcellus Shale well site.

A Marcellus Shale well begins to be drilled after the site was prepared by Shallenberger Construction.

A Shallenberger Construction crew milling and paving roads.

Milling area roadways.

A compressor station, used to transport natural gas from one location to another, after construction.

Pipe for a storm water control system at Uniontown Hospital.